Loading...
Meriç-Ergene

The Draft Scoping Environmental Impact Report prepared within the scope of “Technical Assistance to Prepare Flood Risk Management Plan for Meriç-Ergene River Basin” is available for consultation.

27.07.2023
“Technical Assistance to Prepare Flood Risk Management Plan for Meriç-Ergene River Basin” project co-financed by the European Union (IPA-2) and the Republic of Türkiye, officially started on March 7, 2022, and the duration of the project is 36 months. The purpose of this project is to prepare a Flood Risk Management Plan in the Meriç-Ergene Basin in line with the EU Flood Directive 2007/60/EC.

Within the framework of this project, the Draft Scoping Environmental Impact Report, which is one of the most important elements of the preparation of the Meriç-Ergene Basin Flood Risk Management Plan, was prepared.

With this report, it is aimed to reduce the possible adverse environmental impacts of flooding and to manage it with a participatory approach to help decision makers.

Accordingly, the Draft Scoping Strategic Environmental Impact Report prepared within the scope of the project has been published on the official websites of the Ministry of Agriculture and Forestry, General Directorate of Water Management and the Ministry of Environment, Urbanization and Climate Change, General Directorate of Environmental Impact Assessment, Permit, and Inspection. You can access the report from the links below.

Click here to access the Draft Scoping Environmental Impact Report, which is available for consultation on the website of the General Directorate of Water Management. 

Click here to access the Draft Scoping Environmental Impact Report which is available for consultation on the website of the General Directorate of Environmental Impact Assessment, Permit and Inspection.